Gigafactory Berlin-Brandenburg
Grünheide, Brandenburg, Germany
Tesla's Model Y plant in Grünheide, 35 km south-east of Berlin, opened in March 2022 amid disputes over forest, water and expansion.
Key facts
- Location
- Grünheide (Mark), Brandenburg, Germany; about 35 km south-east of central Berlin
- Site area
- About 300 ha (3 km²); land priced at €13.50 per sq m, about €41 million (Wikipedia)
- Announced
- 12 November 2019, at the Das Goldene Lenkrad awards
- Opened
- Officially 22 March 2022; Tesla says production started near the end of Q1 2022
- Builds
- Model Y
- Installed capacity
- >375,000 Model Y a year (Tesla, Q3 2026; not the production rate); plan-stage goal 500,000
- Workforce
- 11,500 (October 2023, per Wikipedia)
- Ownership
- Owned by Tesla (10-K for fiscal 2025)
Gigafactory Berlin-Brandenburg is Tesla's car plant in Grünheide, Brandenburg, about 35 km south-east of central Berlin; Fortune called it Tesla's first plant in Europe. Musk announced it on 12 November 2019, construction began in early 2020, and it officially opened on 22 March 2022. It builds the Model Y, with installed capacity of more than 375,000 a year as of Q3 2026. Its expansion was opposed in a local vote, and a suspected arson attack in 2024 temporarily halted production.
Highlights
- Announced 12 November 2019; officially opened 22 March 2022
- Builds the Model Y; installed capacity >375,000 a year (Tesla, Q3 2026)
- Grünheide voters rejected an expansion plan 3,499 to 1,882 in a non-binding February 2024 vote
- Production temporarily halted after a suspected arson attack on the power supply on 5 March 2024
Location, announcement and opening
The plant is in Grünheide (Mark), Brandenburg, 35 kilometres south-east of central Berlin, on a site of about 3 km². Musk announced it on 12 November 2019 at the Das Goldene Lenkrad award show. According to Wikipedia, Tesla was to pay €13.50 per square metre for the 300-hectare site, about €41 million in total, and the plan envisaged annual capacity eventually reaching 500,000 cars at an expected cost of around €4 billion. Construction began in early 2020, and the factory officially opened on 22 March 2022. Tesla's 10-K says it started production at Gigafactory Berlin-Brandenburg "only closer to the end of the first quarter of 2022." By 29 April 2022 the plant was producing the Model Y Performance with 2170 cells, according to Wikipedia. Fortune described it at the opening as Tesla's first plant in Europe.
Capacity and workforce
Tesla's Q3 2026 update lists Berlin with installed capacity of more than 375,000 Model Y a year, the only vehicle model it lists for the site and the same figure as in its Q4 2024 update; Tesla notes that installed capacity is not the current production rate. In the same update Tesla said it had "attained record production at Gigafactory Berlin," without giving a number. Wikipedia gives a workforce of 11,500 as of October 2023. In 2023 the IG Metall union said more than 1,000 employees had jointly demanded improved working conditions, in a first-time campaign at the Grünheide factory.
Forest, water and the expansion vote
About 160 hectares of vegetation was cleared for the factory; by 2022, 265 hectares of new multiple-species forest had been planted elsewhere, according to Wikipedia, which also says later phases of the plant would need further water supply. In 2024 Tesla sought to expand the 300-hectare site by 170 hectares, which would have involved felling about 100 hectares of pine forest, CleanTechnica reported. A citizens' initiative backed by several ecologists pointed out that part of the planned expansion area is in a water protection area; Tesla has repeatedly pledged to keep water use to a minimum and to recycle its wastewater rigorously, the same report said. In a non-binding local vote in February 2024, 3,499 Grünheide voters opposed the plan and 1,882 supported it. In May 2024 local councillors approved a revised plan by 11 votes to 6, with two abstentions, allowing 47 hectares of trees to be felled instead of the 100 hectares initially proposed; Euronews reported that protests had brought the revision to the plans.
Arson attacks and other incidents
In 2021 a left-wing extremist group using the name Vulkangruppe claimed responsibility for an arson attack on a transmitter tower at the construction site, according to Wikipedia. On 5 March 2024, unknown people set fire to a high-voltage pylon between Steinfurt and Hartmannsdorf, leaving about 2,000 people without power, including the factory, Electrek reported, citing DW. Wikipedia, which describes the target as a nearby electricity substation, says production at the plant was temporarily halted after the suspected arson attack, which was later claimed by a group using the name Vulkangruppe. Separately, on 26 September 2022 a fire broke out at the factory after 800 cubic metres of cardboard and wood caught fire in its recycling facility, according to Wikipedia.
Sources
- Wikipedia — Giga Berlin
- Tesla 10-K for fiscal 2022 (SEC)
- Tesla 10-K for fiscal 2025 (SEC)
- Tesla Q4 2024 shareholder update (PDF)
- Tesla Q3 2026 shareholder update (PDF)
- Electrek — Tesla shuts down Giga Berlin after suspected sabotage (March 2024)
- CleanTechnica — Grünheide voters say no to Tesla expansion plan (February 2024)
- Euronews — Grünheide council approves revised Tesla expansion (May 2024)
- Fortune — Giga Texas opening (April 2022; mentions Berlin opening)
Frequently asked
Cite this page
Reviewed Nov 12, 2026ElonFacts.org. (2026). Gigafactory Berlin-Brandenburg. Retrieved from https://elonfacts.org/facilities/gigafactory-berlin
"Gigafactory Berlin-Brandenburg." ElonFacts.org, Nov 12, 2026, https://elonfacts.org/facilities/gigafactory-berlin.
@misc{elonfacts-facilities-gigafactory-berlin, title={Gigafactory Berlin-Brandenburg}, author={{ElonFacts.org}}, year={2026}, url={https://elonfacts.org/facilities/gigafactory-berlin}}
https://elonfacts.org/facilities/gigafactory-berlin