Gigafactory Nevada
Storey County, Nevada, USA
Tesla-owned battery plant east of Reno where Panasonic makes cells and Tesla builds packs, drive units and Powerwall and assembles the Semi.
Key facts
- Location
- Tahoe Reno Industrial Center, Storey County, about 20 miles east of Reno (Tesla 10-K lists Sparks, Nevada)
- Ownership
- Owned by Tesla (FY2025 10-K); parts of the building leased to suppliers
- Announced
- 4 September 2014 (site clearing from summer 2014)
- First production
- Limited Powerwall production, January 2016; grand opening 29 July 2016
- Cell production
- Panasonic 2170 cell mass production from January 2017
- Size
- 5.4 million sq ft facility (2023); about 2,900 acres of land
- Builds
- Battery packs, drive units, Powerwall; assembles the Tesla Semi. Wikipedia also lists the Megapack; Tesla’s Q3 2026 capacity table lists no Megapack capacity for Nevada
- State incentives
- 2014 package est. $1.25–1.3 billion; $330 million abatement for the 2023 expansion
Gigafactory Nevada is a Tesla-owned battery and powertrain plant in the Tahoe Reno Industrial Center, Storey County, about 20 miles east of Reno. Announced with state officials in September 2014, it began limited Powerwall production in January 2016. Panasonic makes cells inside the plant; Tesla builds battery packs, drivetrain components and the Powerwall there and assembles the Semi. Wikipedia also says the Megapack is made there, but Tesla's Q3 2026 capacity table lists no Megapack capacity for Nevada. Nevada's 2014 incentive package for the plant has been estimated at $1.25 billion to $1.3 billion.
Highlights
- Owned by Tesla; Panasonic makes cells inside
- Battery packs, drive units, Powerwall and Semi assembly
- 2014 state incentive package estimated at $1.25–1.3 billion
- $3.6 billion expansion granted $330 million in tax abatements (2023)
Location, ownership and timeline
Gigafactory Nevada is in the Tahoe Reno Industrial Center in Storey County, about 20 miles east of Reno. Tesla's annual report for 2025 lists it as Sparks, Nevada, and records it as owned. According to Wikipedia, Tesla owns the land and building and leases parts of the building to several suppliers. The site and plans were announced with state officials on 4 September 2014, although brush clearing and grading had started that summer (the permit date was 26 June) and vertical construction was reported in January 2015. Limited Powerwall production began in January 2016, a grand opening event was held on 29 July 2016, and mass production of 2170 cells began in January 2017. The Nevada Independent described the plant in 2023 as a 5.4-million-square-foot facility. Wikipedia gives a land area of about 2,900 acres and reports that in January 2017 the building's footprint was 1.9 million sq ft, with 4.9 million sq ft of usable area across several floors.
Panasonic's role and what the plant makes
Panasonic works inside the plant as an investment partner: Tesla owns the land and building, while Wikipedia says Panasonic owns some of the cell production equipment. It reached a basic agreement with Tesla in July 2014 to invest in the factory, and in early 2016 its president, Kazuhiro Tsuga, confirmed a planned investment of about $1.6 billion to equip it. As of about 2019, Wikipedia says Panasonic occupied more than half of the factory and operated 13 cell lines. Panasonic said in July 2025 that it had produced over 11 billion EV battery cells at the Sparks site since 2017, and Tesla's 2025 annual report says it still relies on suppliers such as Panasonic and CATL for cells. The factory supplies battery packs and drivetrain components, including motors, for Tesla's vehicles, produces the Powerwall and assembles the Tesla Semi. According to Wikipedia it also manufactures the Megapack, which was designed there, although Tesla's Q3 2026 capacity table lists installed Megapack capacity only for California, Shanghai and Texas; for Nevada it lists capacity for products including the Powerwall and the Semi. It produced its 5 millionth drive unit on 5 June 2024. In its Q3 2026 update, as reported by trade outlets, Tesla said it had shipped its first Megapacks built solely with its own lithium iron phosphate (LFP) cells from Nevada.
The 2014 incentive deal
Not a single Nevada lawmaker voted against the 2014 incentive package, though some detractors called it a corporate giveaway. The Nevada Independent has described it as a $1.3 billion package and, in later reporting, as tax incentives estimated at $1.25 billion over 20 years. According to Wikipedia, the largest items were a 20-year sales tax abatement ($725 million) and a 10-year property tax abatement ($332 million). Tesla's 10-K says the agreements provide tax abatements, discounts to base energy tariffs and transferable tax credits of up to $195 million, in return for capital-investment and hiring targets that were met. The credits were diverted from programs for film production and insurance headquarters. Governor Brian Sandoval estimated the deal would inject $100 billion into Nevada's economy over 20 years, a projection some economists called "deeply flawed", according to Wikipedia. A 2018 report by the Governor's Office of Economic Development (GOED) found Nevada had abated $240.3 million in taxes so far, and that Tesla's capital investment was just over $6 billion, against the $5 billion the deal assumed.
The 2023 expansion and the Semi
In January 2023 Tesla announced it would invest $3.6 billion to grow the Nevada Gigafactory by 4 million square feet and add two factories, one for battery cells and one for the electric Semi truck. In March 2023 GOED's board unanimously approved a $330,250,366 tax abatement over 20 years: 100 percent reductions in property tax and the Modified Business Tax for 10 years, and a 20-year cut in the sales and use tax rate from 7.6 percent to 5.35 percent. GOED's announcement described a planned 100 GWh cell factory with enough capacity for batteries for 1.5 million light-duty vehicles a year, and said the project was expected to create 3,000 jobs. GOED projected $766 million in new tax revenue over 20 years and said Tesla would pay at least $53 million a year in property and modified business taxes from 1 July 2024. In its Q3 2026 update, as reported by Tesla North, Tesla said it began volume production of the Semi and listed installed Nevada Semi capacity at 25,000 trucks a year.
Jobs and workplace safety
GOED's 2018 report counted 7,059 employees at 30 June 2018, more than the 6,000 to 6,500 legislators expected in 2014, with average hourly wages of $25.78 against Tesla's original projection of $27.35. Tesla reported a 93 percent in-state residency rate for qualified employees; the agreement required at least 50 percent. Governor Lombardo said in 2023 that the plant had created more than 11,000 highly paid permanent jobs; the basis is not stated. According to Wikipedia, in 2019 staff at the factory refused entry to OSHA inspectors who had obtained a search warrant for an inspection. According to Wikipedia, in 2018 a former security employee, Karl Hansen, alleged the theft of $37 million of raw materials; an arbitrator denied his claims in 2022.
Sources
- Tesla Form 10-K for fiscal 2025 (properties, Nevada incentives, cell suppliers)
- Wikipedia — Giga Nevada
- Wikipedia — Megapack
- Nevada Independent — What Tesla’s multibillion-dollar Gigafactory expansion means for Nevada (2023)
- Nevada Independent — Gigafactory surpasses 2014 job and investment projections (2018)
- Nevada Independent — Tesla announces $3.6 billion Nevada investment (Jan 2023)
- Nevada Independent — Tesla gets $330 million in tax breaks (Mar 2023)
- Area Development — Tesla expansion in Storey County, Nevada (GOED release, Mar 2023)
- Panasonic Energy North America — new EV battery facility (Jul 2025)
- Drive Tesla Canada — Tesla Q3 2026 update: energy (Oct 2026)
- Tesla North — Six things in Tesla’s Q3 2026 deck (Oct 2026)
- Tesla Q3 2026 shareholder update (PDF)
Frequently asked
Cite this page
Reviewed Nov 12, 2026ElonFacts.org. (2026). Gigafactory Nevada. Retrieved from https://elonfacts.org/facilities/gigafactory-nevada
"Gigafactory Nevada." ElonFacts.org, Nov 12, 2026, https://elonfacts.org/facilities/gigafactory-nevada.
@misc{elonfacts-facilities-gigafactory-nevada, title={Gigafactory Nevada}, author={{ElonFacts.org}}, year={2026}, url={https://elonfacts.org/facilities/gigafactory-nevada}}
https://elonfacts.org/facilities/gigafactory-nevada